Freelance quantity surveying: interim payment applications, quantity take-off, BOQ preparation, variations and final accounts. Remote, per project.
| Item | Deliverable |
|---|---|
| 01.01 | Monthly interim payment application with summary, measurement sheets and supporting back-up |
| 01.02 | Quantity take-off from drawings or a Revit model, with sketches cross-referenced to drawing numbers |
| 01.03 | Bills of quantities for tender or for subcontract packages |
| 01.04 | Rate build-ups for new items and star rates, with sources for labour, plant and material |
| 01.05 | Price adjustment calculations using the indices named in the contract |
| 01.06 | Variation register and valuation of instructed changes |
| 01.07 | Final account and the document list for taking-over and performance certificates |
| 01.08 | Independent review of a contractor's application on behalf of an employer |
You share the contract, priced BOQ or rate schedule, drawings, previous applications and site records. Within the first week I send back a list of anything missing.
I build the application in the format the engineer or main contractor expects, with item codes mapped to the BOQ from the start.
Quantities come from drawings or the model and are reconciled with site measurements. Every difference is listed with a reason.
The package goes through formula and total checks before I issue it as Excel and PDF. When the engineer comes back with queries, I draft the written replies.
The payment application decides a project’s cash flow. If it is late, payment is late. If it is wrong, it comes back and payment slips another month. Even so, on many projects it lands on an engineer who is already busy running the site.
I have worked on site and in technical offices since 2014. I prepared payment applications and new-item rates on a concrete arch dam in Türkiye, an international airport and a wastewater treatment plant in Saudi Arabia, and ran final accounts on university campus and solar projects. You can use that experience for the months you need it, without adding a permanent post.
A good payment application is one the engineer can certify without querying a single line. Every measured item ties back to a sketch and every sketch to a drawing number. New rates arrive with their build-up and sources. Price adjustment shows each index value with its publication date.
With each package I add a short note on where every figure comes from, so that your own team can take the structure over later if you want to bring the work back in-house.
Take a mid-sized contractor building a school under a FIDIC Red Book contract in the Gulf. The site manager prepares the applications on top of running the site, variations have piled up by month three and nobody has claimed price adjustment yet. I would start by reviewing the contract and previous applications, then calculate the missing adjustment periods and prepare rate build-ups for the instructed changes. From then on I prepare the monthly application and the site team only deals with measurement records.
A final account should start alongside the last payment applications, not after them. Re-measurement (faster when quantities come from a Revit model), reconciliation with as-built drawings and tying each variation to its instruction all take time. Run in parallel, the final account is ready close to completion and retention release does not wait longer than it has to.
Turkish contractors working in the Gulf, Central Asia and Africa often look for someone who works in Turkish with head office and in English with the engineer, and who knows the FIDIC payment clauses. On a project in Saudi Arabia I led the technical office, covering payments, document control, new rates and material approvals. I can work as that bridge between your head office and the project.
Employer and subcontractor payment applications, budget and cost studies, BOQ work and comparative take-offs.
Finishing works payments, rates for new items and contract amendments.
Payment applications, new unit rates, comparative take-offs, design revisions, material submittals and procurement.
Usually not. I work from drawings, measurement records and site photos. Where a final account needs a joint measurement on site, I price the visit as a separate line in the proposal.
Whatever the contract names. Most of my work has been under FIDIC contracts with project-specific BOQs and under Turkish public works rules. If your contract calls for a specific method of measurement, tell me at the enquiry stage and I will confirm before quoting.
Yes. I check quantities, rates, price adjustment and variations line by line and give you a report of the differences with reasons, so you can certify with confidence.
Either a monthly fee for ongoing applications or a fixed fee per package, quoted in EUR, GBP, USD or AED. Every engagement runs on a written scope, a delivery schedule and an invoice.
We sign an NDA before any files change hands. Documents stay in the shared space you choose, and my working copies are deleted after handover.
Earlier than most teams think. Running final account measurement alongside the last few payment applications saves months at taking-over.