FIDIC / EPC treatment plants
Payment applications, payment schedules, contracts and amendments, tender documents and claim reports.
Services · 03
Freelance planning engineer for Primavera P6 and MS Project: baseline schedules, resource-loaded programmes, S-curves, progress reports and delay analysis.
| Item | Deliverable |
|---|---|
| 03.01 | Tender programme with linked cash flow forecast |
| 03.02 | WBS and activity list with duration and logic rationale |
| 03.03 | Baseline programme (Primavera P6 .xer or MS Project .mpp) |
| 03.04 | Resource and cost-loaded programme with histograms |
| 03.05 | S-curves (planned, actual, earned value) |
| 03.06 | Weekly or monthly progress report |
| 03.07 | Revised programme and as-planned versus as-built delay analysis |
I break the work into a WBS using the contract period, milestones, drawings and BOQ. For a tender programme I confirm the required format first.
Durations come from quantities and realistic crew outputs, and every constraint gets a written reason.
I load resources and costs, then check the critical path and float. Cash flow is mapped to the BOQ items you will be paid against.
Once the baseline is accepted I run periodic updates and reports. When delay happens, the comparison programme comes from the same data.
A programme is not just a chart for the engineer. It tells the site when each crew starts, tells procurement when to order, and tells finance what each month’s payment will be. If it is out of date, each of those questions gets a different guess.
Because I also work on quantities and payments, I build programmes linked to both. Durations come from measured quantities and realistic outputs, cost loading comes from the BOQ. The cash flow the programme produces then matches the figures finance sees in the payment applications.
Tender programmes tend to be produced in the last days of a bid, between other documents. The mistakes I see most often: no allowance for weather or seasonal restrictions, no submittal and procurement durations in the programme at all, activities linked only start-to-start, and a critical path that runs through one long activity. These programmes get accepted, then lose touch with the site in the first month.
A contractor has won an infrastructure package under a FIDIC Red Book contract and must submit a baseline programme within the period the contract sets. The site team is busy mobilising and the planner has not been hired yet. I build the WBS from the contract documents and BOQ, prepare a resource-loaded baseline in P6 and write the narrative that goes to the engineer. I then run the monthly updates remotely. When the contractor hires a permanent planner, I hand over the programme and the reasoning behind it.
An extension of time submission has to show the cause and effect of delay through the programme. That needs a sound baseline and regular updates. I insert the delay event as a fragnet, measure its effect on the critical path and combine the result with the notices and records kept on the contract side. This works best alongside my contract administration service, where the same events are already logged.
A monthly progress report is only useful if someone acts on it. I keep reports short: planned against actual progress, the activities driving the critical path, the next month’s look-ahead and the risks that could move the completion date. Figures in the report come straight from the updated programme, so there is no second version of the truth.
Payment applications, payment schedules, contracts and amendments, tender documents and claim reports.
Payment applications, contract amendments, tender and planning documents, final account.
Whichever the employer requires. FIDIC projects and larger works usually ask for P6. MS Project is often enough for smaller jobs.
Yes. I build it on the assumption that it will become the baseline later. Rebuilding a programme after award costs more than building it properly once.
The site sends weekly or monthly progress in a simple sheet. If items are unclear we sort them out on a short call.
Yes. I compare the baseline with the updated programme to show the cause, duration and critical path effect of each delay. In an extension of time submission, this analysis is the backbone of the file.
I load the value of the BOQ items onto the activities, so the S-curve and cash flow forecast run on the same numbers as your payment applications.
It depends on the size of the programme and the state of the existing data. I state the timescale in writing in the proposal before we start.
New project
Describe what needs doing and we will pin down scope and timing together.